Mt Cattlin
Galaxy Resources wholly owns the Mt Cattlin spodumene project, located two kilometres north of the town of Ravensthorpe in Western Australia. Previously Galaxy was mining pegmatite ore at Mt Cattlin which was processed on site to produce a spodumene concentrate and a tantalum by-product. At full capacity, ore could be processed at a rate of one million tonnes per annum (
Mining
The Mt Cattlin mine operations include open-pit mining of a flat-lying pegmatite ore body. The flat-lying nature of the ore body allows mining to proceed at a constant strip ratio once the ore is uncovered. Mining is carried out using excavator and truck operations, delivering to a conventional crushing and HMS gravity recovery circuit. Contract mining is used for grade control drilling and earthmoving operations (drilling, blasting, load, haul and ancillary work) for the open-cut mining operation. The pit design encompasses existing measured and indicated resources and has been defined as the Dowling pit.
Processing
The processing plant at Mt Cattlin is located to the west of the Dowling pit, approximately 2 kilometres north-west of the Ravensthorpe townsite. The plant consists of a 4-stage crushing circuit producing a -6mm product from ROM ore at a treatment rate of 1 million tonnes per annum. The crushing plant provides feed to a fine ore bin and this fine ore bin feeds the concentrator on a continuous 24 hour per day basis.
The concentrator consists of reflux classifier, dual size steam, two stages of Heavy (or Dense) Media Separation (HMS) cyclones, with mechanical
Coarse waste HMS plant float material is collected in a surge bin and then trucked to either the waste dump or to mined out areas of the pit(s) as back-fill. There is a possibility that this material could be sold as a by-product. The HMS pre-screen undersize (-0.5mm) is treated by gravity suspension (spiral classifiers) to recover tantalite and residual spodumene). Tantalite circuit tailings and other plant spillage streams are directed to a thickener for process water recovery. Thickener underflow is pumped to a tailings dam approximately 500 metres from the plant.
The key process steps are:
• Open pit mining
• Crushing and screening to -6mm
• Reflux Classifier to remove mica flakes
• Two stage heavy media separation (HMS) in two separate size streams
• Gravity concentration (spirals and wet tables) of tantalite minerals
• Production of 137,000 tonnes of spodumene concentrate
• Shipment of bulk
Power Generation
Power on site at Mt Cattlin is provided by a dedicated diesel generator supported by state-of-the-art solar tracking technology. Galaxy has 14 giant solar trackers and 2 wind turbines in operation at Mt Cattlin, which together generate 226 MWh per year of renewable energy. Mt Cattlin was the first mine site in Australia to have real-time solar tracking panels as part of its power generating requirements. The solar tracking feature means the solar panels are able to follow the sun in all directions to maximise the power generated and provide 15% more power than a single axis system.
The wind and solar hybrid system